Skip to main content

Engineering Solutions

Waste heat recovery in heavy industrial plants: the payback equation

08/10/2024BKET Project Team1 min read

A calculation model for using biomass boiler flue gas to preheat feedwater, cutting fossil fuel consumption by up to 18%.

For the full technical report or advice for your plant, please contact a BKET expert.

Leave a Reply

Your email address will not be published. Required fields are marked *