Skip to main content
Renewable energy and BKET energy technology

Comprehensive energy engineering & technology solutions

Turning field measurement data into high-value engineering solutions, guaranteeing energy savings and building a solid Net Zero roadmap for key industrial manufacturing plants.

SAVINGS RATE

15 – 35%

Average energy cost savings verified by M&V measurement

ECONOMIC GUARANTEE

EPC/ESCO guarantee

Clear output-commitment contracts, with compensation for any shortfall

PAYBACK PERIOD

12 – 24 MONTHS

Optimized CAPEX/OPEX for rapid positive cash flow

INTERNATIONAL STANDARDS

ISO 50001 & GHG

Compliant with GHG emission inventory reporting and CBAM

Industrial BESS Battery Container SystemBESS CONTAINER LFP
Storage & grid stabilization

Battery energy storage system (BESS)

Industrial battery storage that charges during off-peak hours and discharges during peak hours (peak shaving).

  • Cut peak-hour costs: Significant savings on electricity tariffs.
  • Stable power supply: Prevents voltage sags and keeps loads running continuously.
  • Production protection: Instant microgrid switchover protects automated lines.
Mod: BKET-BESS-IND · Integrated BMS & EMS 4.0
Commercial Rooftop Solar Panel ArrayHIGH-EFFICIENCY PV
Renewable rooftop energy

Rooftop solar power system

Uses factory roofs to convert sunlight into clean electricity for daytime production self-consumption.

  • Energy independence: Reduces grid dependence by 25% – 40%.
  • Roof insulation: Lowers roof temperature by 3°C – 5°C, reducing HVAC load.
  • Lower CO2 emissions: Supports I-REC certification for exports.
Industrial biomass boiler and waste heat recovery WHRS heat exchanger systemFlue-gas heat technology
WHRB heat recovery system & high-efficiency 15 T/H biomass boiler · ASME SECTION I STANDARD

Biomass fuel conversion

Converting coal-fired boilers to biomass fuel (rice husk, pellets, sawdust), eliminating 100% of coal emissions and saving 15 – 25% in costs.

  • Reduced SOx, NOx and fine dust emissions
  • Carbon-neutral Net-Zero fuel
  • 15 – 25% fuel cost savings
Standard: ASME section I

Waste heat recovery (WHRB – Waste Heat Recovery)

Recovers furnace flue-gas heat (180°C – 450°C) to heat feedwater and superheat steam, saving 12 – 18% fuel.

  • Recovers 70% – 85% of lost energy
  • Boosts boiler efficiency by 5% – 10%
  • Lower flue-gas temperature protects the environment
Standard: TCVN 7704 & ASME

Flash steam & condensate recovery (Flash Steam Recovery)

Recovers high-pressure condensate, re-flashes it and pumps it directly to the boiler feed, saving 10 – 15% water and chemicals.

  • Recovers 80 – 90% of clean condensate
  • Significantly reduces feedwater treatment chemicals
  • Cuts boiler fuel use by 10 – 15%
System: Closed condensate loop

Combustion optimization & high-efficiency burners

O2/CO sensors automatically control the air/fuel ratio, raising boiler efficiency to > 88% and cutting fuel by 4 – 8%.

  • Optimal excess O2 control in the 2% – 3% range
  • Completely eliminates unburned CO
  • Low-NOx burners minimize flue-gas pollution
Control: Automated O2 trim VFD
Industrial HVAC chiller plant room with thermal energy storage TES water tanksHVAC & thermal storage
Central chiller plant with integrated TES storage tank & ATCS tube cleaning · COP OPTIMIZATION
Load shifting

Thermal energy storage (TES)

Uses cheap night-time electricity to produce chilled water stored in tanks for daytime use. Cuts cooling electricity costs by 20% – 35%.

  • Shifts 100% of peak cooling load
  • Reduces daytime chiller compressor installed capacity
  • Saves 20% – 35% on electricity bills
Ice / water storage · Peak cut feature
Automatic 24/7

Continuous condenser tube cleaning system (ATCS)

Rubber balls automatically and continuously clean the tube bundle, preventing scaling and raising chiller COP by 10% – 15%.

  • Chillers always run at maximum COP
  • Direct chiller power savings of 10% – 15%
  • No periodic shutdowns for mechanical tube rodding
Sponge ball circulation · Automatic, chemical-free
Eco water treatment

Electronic descaling system

Chemical-free ionic water treatment that inhibits algae and microbes, saves circulating water and protects equipment.

  • No toxic anti-scaling chemicals
  • Thoroughly inhibits algae and microbial growth
  • Extends blowdown cycles, saving circulating water
Electromagnetic field · Environmentally friendly
Compressed air station central control systemPLC SEQUENCING CONTROL
Multi-unit sync

Compressed air station central control system

A sequencing algorithm dispatches load based on actual pressure, cutting compressor station power by 12% – 20%.

  • Sophisticated pressure-based load sequencing algorithm
  • Maintains stable pressure within ±0.1 bar
  • Cuts total station power consumption by 12% – 20%
Master PLC controller · Multi-compressor coordination
Air Compressor Waste Heat Recovery SystemAIR COMPRESSOR HEAT RECOVERY
70% – 90% heat recovery

Air compressor waste heat recovery

Captures 70% – 85% of heat to produce 60°C – 85°C hot water for boiler feed or domestic use, with a 6 – 12 month payback.

  • 316L stainless steel plate heat exchanger: High-efficiency heat recovery from oil and compressed air.
  • Continuous 60°C – 85°C hot water: Directly cuts fuel & electricity costs.
  • Safety control valve: Automatically stabilizes temperature for 100% compressor protection.
Efficiency: Up to 90% heat recovery · Payback: 6 – 12 months
Ultrasonic camera detecting compressed air leaks on siteULTRASONIC ACOUSTIC IMAGING
Ultrasonic leak test

Operational optimization & ultrasonic compressed air leak detection

On-site leak detection with ultrasonic cameras, fixing pressure losses and cutting wasted power by 15% – 30%.

  • Every 1 bar drop in system pressure saves 7% power
  • Reduces pipeline leakage losses by 15% – 30%
  • Optimized Ring Main loop for even pressure
SDT / FLIR acoustic imager · Loss level report
Industrial energy management system EMS and PMS control roomSCADA operations center
BKET-EMS energy monitoring room and real-time PMS load dispatch · ISO 50001 METERING STANDARD
Real-time telemetry & EnPI

Energy monitoring system (BKET-EMS)

Real-time collection of electricity, steam, heat and water data via Modbus/TCP, MQTT.

  • EnPIs & EnB monitoring: Automatically calculates specific energy consumption.
  • Abnormal load alerts: Instant fault detection and overload prevention.
  • Automated ISO 50001 reports: Standardized audit data.
Platform: BKET-EMS Cloud & on-premise · SCADA / ERP integration
Automation & power quality

PMS control & automation system (Power Management System)

Automation of substations, standby generators, interlock protection and power quality monitoring.

  • Load shedding control (peak shaving): Optimizes contracted demand.
  • Harmonic filtering & power factor correction: Ensures Cosφ > 0.98.
  • Automatic fault sectionalizing: Isolates faulty zones to keep the system safe.
Protocol: IEC 61850 & Modbus TCP · Industrial automation
AHF active harmonic filter and SVG reactive power compensation cabinets at an industrial substationMulti-function AHF / SVG active harmonic filter cabinet
Ultra-fast reactive power compensation & 2nd – 50th order harmonic elimination · THDi < 5% • COSφ > 0.98
Active harmonic filter

Active harmonic filter (AHF)

Selectively filters harmonics from the 2nd to the 50th order with an ultra-fast response time of < 5ms. Brings total current harmonic distortion (THDi) below 5%, in strict compliance with Circular 39/2015/TT-BCT and the international IEEE 519 standard.

  • Eliminates harmonics from non-linear loads (VFDs, induction furnaces, UPS, welders).
  • Reduces transformer heating & prevents conventional capacitor bank explosions.
Response time: < 5ms · IEEE 519 & Circular 39/BCT compliant
Dynamic VAR control

Dynamic reactive power compensation (SVG – Static Var Generator)

Continuous bidirectional reactive power compensation (both inductive and capacitive), completely eliminating reactive power penalties (power factor always maintained > 0.98), independent of mechanical capacitor steps.

  • Eliminates the risk of voltage resonance causing capacitor explosions.
  • Saves hundreds of millions of VND per year in power factor penalties.
Power factor (cos phi): > 0.98 · Ultra-fast response
Power quality audit

Comprehensive power quality diagnostics & optimization

Fluke 435-II analyzers record continuously for 7 days and nights to produce an actual harmonics report and size AHF/SVG cabinet capacity precisely for each substation.

  • Post-installation performance commitment, verified with independent meters.
  • Performance warranty and lifetime periodic maintenance support for the system.
G7 instruments: Fluke 435-II · Performance guarantee

ENGINEERING WORKFLOW STANDARDS

Engineering solution implementation process

Working closely with you from on-site measurement with G7 lab-grade instruments to acceptance of guaranteed actual savings under the international IPMVP protocol.

Preliminary survey & field measurement

We deploy specialized G7 instruments (Fluke, FLIR, Testo, Flexim) on site for 7 – 14 days of continuous measurement to capture accurate load profiles.

G7 standardized instruments

Modeling & feasibility analysis

Sankey energy balance diagrams; CAPEX, OPEX, NPV and IRR cash-flow modeling with transparent financial reports for the Board of Directors.

Transparent ROI & NPV reports

Engineering design & equipment fabrication

Energy engineers prepare detailed 2D/3D construction drawings; mechanical, thermal and electrical structures are fabricated in our workshop to ASME & TCVN standards.

ASME mechanical standards

Installation & FAT/SAT testing

Installation to strict HSE safety standards, factory acceptance testing (FAT) and site acceptance testing (SAT) without interrupting production lines.

Top-tier HSE occupational safety

M&V verification & performance guarantee

Acceptance based on before-and-after measurements per IPMVP, activating the cost-reduction guarantee and full technology transfer.

IPMVP measurement commitment

CAPITAL & FINANCIAL FLEXIBILITY

Business capital optimization models

Choose a flexible financing option aligned with your plant’s capital strategy and investment budget.

ESCO model (zero upfront investment)

Energy savings with no upfront capital

BKET funds 100% of the audit, equipment, installation and periodic maintenance throughout the contract term. Both parties share the economic benefits from the actual electricity/fuel saved.

  • Upfront investment = 0 VND: Keeps your bank credit lines fully intact for core business operations.
  • 0% technical risk: All periodic maintenance, consumables and breakdowns are handled by BKET.
  • 100% asset handover: At the end of the shared-savings term (3 – 5 years), the entire technology system is fully owned by the plant.
Best for: Cash-flow-focused businesses
EPC general contractor model (turnkey)

Turnkey — Maximize long-term returns

The business provides the CAPEX. BKET acts as general contractor, covering measurement surveys, engineering drawings, genuine equipment procurement, installation and energy performance warranty.

  • Keep 100% of the savings: All savings go to the plant from the first day of commissioning acceptance.
  • Performance guarantee: A contract with clearly committed savings, with compensation if measured targets are not met.
  • Scale on your terms: Easily integrates with the plant’s existing SCADA/MES engineering management infrastructure.
Best for: Businesses with an available CAPEX budget

NATIONWIDE FIELD PROJECTS

Trusted clients & strategic partners

Successfully delivered 250+ key industrial projects
OjitexYamahaMeikoVicemPTSCSamsung · SEVT / SEHCVinFast · Hai Phong ComplexHoa Phat · Dung Quat Steel

FIELD EXPERT TEAM

Ready to survey & measure your plant’s load

BKET’s CEM energy engineers will be at your plant within 24 – 48 hours to perform preliminary measurements, identify savings potential and advise on optimal solutions.

DIRECT HOTLINE:

0247 303 5689

SUBMISSION EMAIL:

info@bket.com.vn

HANOI HEAD OFFICE:

7th Floor, Zen Tower, 12 Khuat Duy Tien, Thanh Xuan Ward, Hanoi

HO CHI MINH CITY OFFICE:

156 Nam Ky Khoi Nghia, Sai Gon Ward, Ho Chi Minh City

Strict confidentiality of measurement data & plant information

Request a survey & technical consultation

Please fill in the details below. A BKET technical expert will contact you directly with a preliminary proposal.