Skip to main content
Wind farm – BKET

Contact & site survey request

Connect with the BKET energy engineering team

Ready to support preliminary load surveys, harmonic analysis, compressed air leak detection, heat balance and comprehensive energy-saving plans for industrial facilities within 24 – 48 hours.

Response within 2 hours

Initial proposal upon intake

Dispatch within 24h

Lead engineer works with you directly

Standardized instruments

Measurement without load interruption

Data security

Full protection of production data

24/7 technical operations hotline

0247 303 5689

Support for load incident response, overload hot-spot thermal measurement and urgent industrial measurement advice nationwide.

Submission email: info@bket.com.vn

HQ Central

Northern head office

Hanoi office

  • Address: 7th Floor, Zen Tower, 12 Khuat Duy Tien, Thanh Xuan Ward, Hanoi
  • Hotline: 0247 303 5689
  • Working hours: Mon – Fri (08:00 – 17:30)

Service radius: Hanoi & northern industrial parks — 24H Onsite

South Hub

Southern coordination office

Ho Chi Minh City office

  • Address: 156 Nam Ky Khoi Nghia, Sai Gon Ward, Ho Chi Minh City
  • Hotline: 0247 303 5689
  • Working hours: Mon – Fri (08:00 – 17:30)

Service radius: HCMC, Binh Duong, Dong Nai — 24H Onsite

Measurement intake & dispatch process

Load information intake

Operators & the engineering department classify the facility’s electrical/thermal systems.

Technical discussion with a CEM engineer

One-on-one phone call to identify energy bottlenecks and prepare measurement tools.

Free site survey & field measurement

Our engineering team visits the plant, installs loggers to record actual data and issues a recommendations report.

Book a consultation

Enter details of your production facility or plant. A BKET lead engineer will contact you to advise and confirm the measurement plan within 24 working hours.

Key technical service of interest

Field engineering dispatch network

Location map & survey service areas

Hanoi head office (Zen Tower)7th Floor, Zen Tower, 12 Khuat Duy Tien, Thanh Xuan Ward, HanoiOpen Google Maps
Ho Chi Minh City office156 Nam Ky Khoi Nghia, Sai Gon Ward, Ho Chi Minh CityOpen Google Maps
Hub300km survey radiusBKET dedicated field positioning system

Nationwide mobility

BKET operates rapid-response specialist measurement teams that reach industrial parks in the North and South within 24 – 48 hours of technical request approval.

North

Bac Ninh, Hai Phong, Quang Ninh, Thai Nguyen, Hung Yen, Ha Nam, Vinh Phuc, Phu Tho.

South

HCMC, Binh Duong, Dong Nai, Long An, Ba Ria – Vung Tau, Tay Ninh, Can Tho.

Central

Da Nang, Quang Nam, Quang Ngai, Ha Tinh, Nghe An (dispatched per project schedule).

Answering your technical questions

Frequently asked questions

Details for plant directors, M&E managers and energy managers.

1. How much does the initial site survey cost?

Completely 100% free. BKET sends CEM engineers to the site for a general inspection and installs preliminary metering equipment to accurately determine savings potential and financial feasibility before you decide to sign a formal contract.

2. Will BKET’s measurement equipment stop the production line?

Absolutely no operational disruption. We use internationally standardized non-intrusive instruments: flexible Rogowski current clamps, high-resolution FLIR thermal imagers, ultrasonic compressed air leak detectors and clamp-on flow meters. Your plant continues production as normal.

3. How long do the measurements and final report take?

On-site measurement takes 2 – 3 working days (covering both day and night shifts to capture base load). After the data is extracted and processed through calculation models, the complete technical report with ROI investment analysis is delivered within 7 – 14 days.

4. Does BKET guarantee actual savings (ESCO model)?

Yes. For EPC or ESCO projects, BKET guarantees actual energy performance in a written contract. Acceptance is based entirely on objective measurement data using the international IPMVP method (International Performance Measurement and Verification Protocol).

Trusted industrial partners

Enterprise clients we have supported with energy measurement

ISO 50001:2018ISO 9001:2015ISO 14064 GHG
OjitexYamahaMEIKOPTSCVICEMHoa PhatVinFast

Strict industrial data confidentiality commitment

All load profiles, single-line diagrams and plant process flows are strictly protected under an NDA signed before measurement begins.